Pure Aqua supplied a complete water treatment
system for a bottling company in Algeria, complete with microprocessor
control panel, high rejection membranes,
feed TDS 7,000 ppm; capacity is 130,000
GPD
LOCATION: ALGERIA-ALGERIA
December 2004
|
|
| 
|
Pure Aqua supplied a BWRO to The Royal Family in Qatar, complete with pre-treatment
and chemical dosing system; capacity is
43,200 GPD
LOCATION: DOHA-QATAR
December 2004
|
|
| 
|
Pure Aqua supplied SWRO for Aysir Construction and Tourism Resort;
system consists of 2 trains of 200m3/day
each, complete with touch panel PLC control
panel, pre-treatment, cleaning skids, chemical
dosing, and energy recovery turbine.
LOCATION:
ISTANBUL-TURKEY
November
2004 |
|
| 
|
Pure Aqua supplied an industrial BWRO system for
Pepsi Cola Co.; capacity is 43,200 GPD with
pre-treatment, pre-chemical dosing system,
and microprocessor control panel
LOCATION: LIMA-PERU
October 2004
|
|
|
Pure Aqua supplied a complete water treatment system
for a bottling company in Yemen, complete with RO pre-treatment
and UV system; capacity is 11,000 GPD
LOCATION: SANA’A-YEMEN
September 2004
|
|
| 
|
Pure Aqua supplied a fully skid mounted, pre-piped,
pre-wired, 3 step filtration process complete
with touch panel PLC control panel, and
chemical dosing systems for Alto Chicama
Mine Project-Camp 4; capacity is 48 GPM
LOCATION: ALTO CHICAMA-PERU
August 2004
|
| |
|
| 
|
Pure Aqua supplied an industrial BWRO system for
an oil lube manufacturer; capacity is 110,000
GPD with pre-chemical dosing systems, cleaning
skid, and microprocessor control panel.
LOCATION: SHUWEIKH-KUWAIT
July 2004
|
|
| 
|
Pure Aqua supplied an industrial BWRO system for
Sugar Factory in Pakistan; capacity is 225,000
GPD with pre-chemical dosing system and
microprocessor control panel
LOCATION: JHANG-PAKISTAN
July 2004
|
|
| 
|
Pure Aqua supplied a SWRO system for Metito International
in UAE; system included high rejection membranes,
microprocessor control panel, and plunger
type high pressure pump; capacity is 11,500 GPD
LOCATION: SHARAJAH-UAE
July 2004
|
|
| 
|
Pure Aqua supplied a two-train industrial BWRO system
for NVE Pharmaceutical Factory in New Jersey-USA;
capacity is 160,000 GPD with pre-chemical
dosing system and membrane cleaning skid
LOCATION: NEW JERSEY-USA
June 2004
|
|
| |
Pure Aqua supplied a fully skid mounted, pre-piped,
pre-wired, 3 step filtration process complete
with clarifier, touch panel PLC control
panel, and chemical dosing systems for Alto
Chicama Mine Project-Camp 1 & 2; capacity
15 GPM
LOCATION: ALTO CHICAMA-PERU
May 2004 |
|
 |
Pure Aqua
Supplied Brackish Water RO to Pure O
Tech California-USA, this system to be
used for irrigation in Northern
California, capacity: 30,000 GPD with
all pre and post treatment systems and
microprocessor control panel
Location: California, USA.
April 2004 |
|
 |
Pure Aqua participates
in the 2004 WQA Water Quality Association
Convention.
Location: Baltimore, Maryland USA.
March 2004 |
|
 |
Pure Aqua Supplied Brackish
Water RO to EEPSA Power plant in Lima Peru,
72,000 GPD with all pre and post treatment
systems and cleaning skid.
Location: Lima-Peru.
March 2004 |
|
 |
Pure Aqua Supplied Brackish
Water RO to a major water treatment wholesale
company in Dubai 43,000 GPD with all instrumentations
and microprocessor control panel.
Location: Dubai-UAE.
February 2004 |
|
 |
Pure Aqua Supplied a
complete reverse osmosis and filtration system
for Universal Robina Company in the Philippines
Islands, 200,000 GPD
Location: Manila-Philippines.
January 2004 |
|
|
|
|
| |
|
|